Whirlpool C WSD 83M WBS FR
Whirlpool

C WSD 83M WBS FR

Model C WSD 83M WBS FRPart no. 859991717770EAN 8003437064234

38 specifications
  • Energy classD
  • Noise64 dB
  • Weight39.5 kg
  • ColourWhite
  • Appliance placementFreestanding
  • Rated capacity8 kg
See all specifications

Overview

Energy class
D
Noise
64 dB
Weight
39.5 kg
Colour
White
Appliance placement
Freestanding
Rated capacity
8 kg
Brand
Whirlpool
Category
Tumble Dryer
Model
C WSD 83M WBS FR
Part number
859991717770
EAN / UPC
8003437064234
Also known as
Whirlpool C WSD 83M WBS FR tumble dryer Freestanding Front-load 8 kg White

Specifications

38 specifications in 5 groups

Design

SpecificationValue
Appliance placementFreestanding
Loading typeFront-load
Drying systemHeat pump
Product colourWhite
Door colourBlack
Control typeButtons, Rotary
Drum volume92 L
Built-in displayYes
Cord length1.5 m

Performance

SpecificationValue
Rated capacity8 kg
Condensation efficiency class (legacy scale)B
Drying programsBedding, Blouse/shirt, Cotton, Cotton eco, Delicate/silk, Down wear/duvet, Freshen-up, Iron dry, Jeans/denim, Mix, Sport, Synthetics, Timed, Towel
Cycle time197 min
Noise level64 dB
Anti-Crease functionYes
Adjustable drying levelYes
Moisture sensorYes

Ergonomics

SpecificationValue
Delayed start timerYes
Delay start (max)24 h
Delay start (min)1 h
Filter cleaning indicatorYes
Water tank full indicatorYes
Wi-Fi controlledNo
Near Field Communication (NFC)No

Power

SpecificationValue
Energy efficiency classD
Energy efficiency class (legacy scale)A++
Energy efficiency scaleA+++ to D
Connected load900 W
AC input voltage230-240 V
AC input frequency50 Hz
Energy consumption1.84 kWh
Annual energy consumption221 kWh
Heat sourceElectric

Weight & dimensions

SpecificationValue
Width597 mm
Depth545 mm
Height846 mm
Weight39.5 kg
Depth with door open104 cm

Similar products

All tumble dryers