
C WSD 74M WBS PL
Model C WSD 74M WBS PLPart no. 859991721560EAN 8003437064883
39 specifications
- Energy classC
- Noise64 dB
- Weight42.5 kg
- ColourWhite
- Appliance placementFreestanding
- Rated capacity7 kg
Overview
- Energy class
- C
- Noise
- 64 dB
- Weight
- 42.5 kg
- Colour
- White
- Appliance placement
- Freestanding
- Rated capacity
- 7 kg
- Brand
- Whirlpool
- Category
- Tumble Dryer
- Model
- C WSD 74M WBS PL
- Part numbers
- 859991721560, 7188304790
- EAN / UPC
- 8003437064883
- Also known as
- Whirlpool C WSD 74M WBS PL tumble dryer Freestanding Front-load 7 kg White
Specifications
39 specifications in 6 groups
Design
| Specification | Value |
|---|---|
| Appliance placement | Freestanding |
| Loading type | Front-load |
| Drying system | Heat pump |
| Product colour | White |
| Custom panel-ready | No |
| Door hinge | Right |
| Door colour | Black |
| Reversible doors | Yes |
| Control type | Rotary, Touch |
| Built-in display | Yes |
| Cord length | 1.5 m |
Performance
| Specification | Value |
|---|---|
| Rated capacity | 7 kg |
| Condensation efficiency class | B |
| Drying programs | Delicate/silk, Eco, Mix, Refresh, Sport, Wool |
| Cycle time | 169 min |
| Noise emission class | B |
| Noise level | 64 dB |
Ergonomics
| Specification | Value |
|---|---|
| Delayed start timer | Yes |
| Delay start (max) | 24 h |
| Delay start (min) | 1 h |
| Remaining time indication | Yes |
| Filter cleaning indicator | Yes |
| Ready indicator | Yes |
| Water level indicator | Yes |
Power
| Specification | Value |
|---|---|
| Energy efficiency class | C |
| Energy efficiency scale | A to G |
| Connected load | 800 W |
| AC input voltage | 230-240 V |
| AC input frequency | 50 Hz |
| Current | 10 A |
| Energy consumption per 100 cycles | 88 kWh |
| Energy consumption | 1.26 kWh |
| Heat source | Electric |
Brand-specific features
| Specification | Value |
|---|---|
| Whirlpool technologies (clothes care) | 6TH SENSE |
Weight & dimensions
| Specification | Value |
|---|---|
| Width | 597 mm |
| Depth | 543 mm |
| Height | 846 mm |
| Weight | 42.5 kg |
| Depth with door open | 104 cm |
Similar products
All tumble dryersBeko
BM3T3823W 8kg Heat Pump Tumble Dryer with Sensor Programmes
Model BM3T3823W
- Energy class
- E
- Noise
- 64 dB
- Weight
- 41 kg











