
C WD 96M WBS BE
Model C WD 96M WBS BEPart no. CWD96MWBSBEEAN 8003437064692
48 specifications
- Energy classA
- Noise60 dB
- ColourWhite
- Appliance placementFreestanding
- Rated capacity9 kg
- Delayed start timerYes
Overview
- Energy class
- A
- Noise
- 60 dB
- Colour
- White
- Appliance placement
- Freestanding
- Rated capacity
- 9 kg
- Delayed start timer
- Yes
- Brand
- Whirlpool
- Category
- Tumble Dryer
- Model
- C WD 96M WBS BE
- Part number
- CWD96MWBSBE
- EAN / UPC
- 8003437064692
- Also known as
- Whirlpool C WD 96M WBS BE tumble dryer Freestanding Front-load 9 kg White
Specifications
48 specifications in 7 groups
Design
| Specification | Value |
|---|---|
| Appliance placement | Freestanding |
| Loading type | Front-load |
| Drying system | Heat pump |
| Product colour | White |
| Custom panel-ready | No |
| Door hinge | Right |
| Door style | Glass window door |
| Door colour | Black |
| Reversible doors | Yes |
| Control type | Rotary, Touch |
| Drum volume | 127 L |
| Built-in display | Yes |
| Display type | LED |
| Cord length | 1.5 m |
| Inverter technology | Yes |
Performance
| Specification | Value |
|---|---|
| Rated capacity | 9 kg |
| Condensation efficiency class | A |
| Drying programs | Synthetics, Jeans/denim, Wool |
| Cycle time | 270 min |
| Noise emission class | A |
| Noise level | 60 dB |
| Anti-Crease function | Yes |
Ergonomics
| Specification | Value |
|---|---|
| Delayed start timer | Yes |
| Delay start (max) | 24 h |
| Delay start (min) | 1 h |
| Drum interior light | Yes |
| LED program stage indicator | Yes |
| Child lock | Yes |
| Adjustable feet | Yes |
| Self-cleaning | No |
| Filter cleaning indicator | Yes |
| Water tank full indicator | Yes |
| Wi-Fi controlled | Yes |
| Near Field Communication (NFC) | No |
Power
| Specification | Value |
|---|---|
| Energy efficiency class | A |
| Energy efficiency scale | A to G |
| Connected load | 600 W |
| Current | 3.5 A |
| Energy consumption per 100 cycles | 79 kWh |
| Energy consumption | 0.79 kWh |
| Annual energy consumption | 148.1 kWh |
| Energy efficiency index (EEI) | 42.9 |
| Heat source | Electric |
Brand-specific features
| Specification | Value |
|---|---|
| Whirlpool technologies (clothes care) | 6TH SENSE, SteamCare, SoftMove |
Weight & dimensions
| Specification | Value |
|---|---|
| Width | 598 mm |
| Depth | 674 mm |
| Height | 846 mm |
Packaging data
| Specification | Value |
|---|---|
| Package weight | 48.5 kg |
Similar products
All tumble dryersBeko
BM3T3823W 8kg Heat Pump Tumble Dryer with Sensor Programmes
Model BM3T3823W
- Energy class
- E
- Noise
- 64 dB
- Weight
- 41 kg











