Whirlpool C WD 86M WBS PL
Whirlpool

C WD 86M WBS PL

Model C WD 86M WBS PLPart no. 859991721620EAN 8003437064920

52 specifications
  • Energy classA
  • Noise63 dB
  • Weight48.5 kg
  • ColourWhite
  • Appliance placementFreestanding
  • Rated capacity8 kg
See all specifications

Overview

Energy class
A
Noise
63 dB
Weight
48.5 kg
Colour
White
Appliance placement
Freestanding
Rated capacity
8 kg
Brand
Whirlpool
Category
Tumble Dryer
Model
C WD 86M WBS PL
Part numbers
859991721620, 7188282120
EAN / UPC
8003437064920
Also known as
Whirlpool C WD 86M WBS PL tumble dryer Freestanding Front-load 8 kg White

Specifications

52 specifications in 5 groups

Design

SpecificationValue
Appliance placementFreestanding
Loading typeFront-load
Drying systemHeat pump
Product colourWhite
Door colourBlack
Control typeRotary, Touch
Drum volume127 L
Built-in displayYes
Tub materialStainless steel
Cord length1.5 m
Suitable for undercounter installationNo
Inverter technologyYes

Performance

SpecificationValue
Rated capacity8 kg
Condensation efficiency classA
Number of drying programs15
Drying programsBaby care, Cotton, Cotton eco, Down wear/duvet, Iron dry, Jeans/denim, Mix, Quick, Refresh, Silent, Synthetics, Wool
Cycle time215 min
Noise emission classB
Noise level63 dB
Anti-Crease functionYes
Alternate rotationYes
Easy iron functionYes
Adjustable drying levelYes
Moisture sensorYes
Condensation efficiency94%

Ergonomics

SpecificationValue
Delayed start timerYes
Delay start (max)24 h
Delay start (min)1 h
Drum interior lightYes
Remaining time indicationYes
LED program stage indicatorYes
Child lockYes
Filter cleaning indicatorYes
Smartphone/tablet remote supportYes
Water tank full indicatorYes
Downloadable additional programsYes
Wi-Fi controlledYes
Near Field Communication (NFC)No

Power

SpecificationValue
Energy efficiency classA
Energy efficiency scaleA to G
Connected load600 W
AC input voltage230-240 V
AC input frequency50 Hz
Current10 A
Energy consumption per 100 cycles73 kWh
Energy consumption0.73 kWh
Heat sourceElectric

Weight & dimensions

SpecificationValue
Width598 mm
Depth674 mm
Height846 mm
Weight48.5 kg
Depth with door open104 cm

Similar products

All tumble dryers